Sustainable biomass
Solid renewable fuel for heat and power — chips, pellets, olive stone and nut shells, SURE-certified and traceable to the mill that produced them.
What biomass actually is
It is the part of a tree or a crop that nobody eats and nobody builds with. Branches and bark left after a forest is thinned. Sawdust from a mill. The stone inside an olive after the oil is pressed out. The shell around an almond.
Dried and sized properly, all of it burns. A tonne of good olive stone carries roughly the energy of 480 litres of heating oil, and the CO₂ released is carbon the plant took out of the air while it grew — not carbon that was locked underground.
Product range
What we can load this month
Indicative specifications. The exact figures for your contract are fixed on analysis of the actual lot before dispatch.
| Product | Moisture | Net CV (kWh/kg) | Ash | Typical use |
|---|---|---|---|---|
| Wood chips (G30–G50) | 25–40% | 2.9–3.6 | 0.5–2.0% | Industrial boilers, district heating |
| Wood pellets — ENplus A1 | ≤10% | 4.6–4.9 | ≤0.7% | Commercial boilers, retail bagged |
| Wood pellets — industrial | ≤12% | 4.4–4.8 | ≤3.0% | Power stations, co-firing |
| Olive stone (pit) | 8–15% | 4.2–4.8 | 0.5–1.5% | Process heat, greenhouses |
| Olive pomace (orujillo) | 10–18% | 3.8–4.4 | 4–8% | Cogeneration, cement kilns |
| Almond & nut shell | 8–14% | 4.2–4.7 | 0.6–2.0% | Process heat, pellet blending |
| Sawdust & shavings | 10–50% | 2.4–4.2 | 0.4–1.2% | Pellet and panel production |
| Forest residue bundles | 30–50% | 2.4–3.2 | 1–4% | Large-scale heat and power |
Delivery
How it reaches you
Bulk, big bag or bagged — road, container or short sea, to a silo, a yard or a hopper.
Bulk road
Walking-floor trailers for chips and residues, tippers for pellets and stone. 24–28 t payload typical, discharged straight into your silo or bunker.
Container & vessel
20 ft and 40 ft containers for export lots, coaster and handysize parcels for volume buyers through Atlantic, Mediterranean and North Sea ports.
Paperwork included
Weighbridge ticket, lab analysis, sustainability declaration and CMR arrive together. Nothing for your team to chase after the truck has gone.
Common questions
Will biomass work in my existing boiler?
What minimum volume do you supply?
Can you guarantee the origin?
Tell us what you burn.
We’ll tell you what can replace it.
Send us your current fuel, your annual volume and your delivery point. You get a specification, an indicative price and a logistics plan — usually within two working days.